Published January 30, 2026
ABIA To Add 32 Gates In Massive $5B Expansion Project
The main article can be about the airport. Let’s make that at the top, with one photo centered and this text (and emojis) below it:
✈️ Austin Airport’s $5B Expansion Takes Shape
Articles across multiple outlets confirm that Austin-Bergstrom International Airport (AUS) is moving ahead with a massive expansion program — with the total build-out now estimated at around $5 billion. This effort aims to alleviate congestion, boost capacity, and future-proof the region’s primary air gateway amid Austin’s rapid population and economic growth.
🛫 Adding Dozens of New Gates
The airport plans to nearly double its number of gates by adding 32 new ones — elevating capacity significantly over the next decade. These new gates will be built as part of a new concourse (often referred to as Concourse B) tied to the massive infrastructure expansion.
🛰 Airlines Signal Long-Term Commitment
Major carriers like Southwest Airlines, Delta, United, American, and Alaska have locked in long-term leases that secure their presence as the expansion unfolds — a clear sign of confidence in Austin’s growth trajectory and travel demand.
🛠 Construction in Motion in 2026
Beyond conceptual plans, actual construction activity is underway this year — including phased terminal upgrades, gate additions, and infrastructure enhancements that will improve passenger experience and operational flow even before the biggest expansions are complete.
